+90 850 533 0 262 TREN
Log in Get a quote

Designed with no single point of failure.

Every facility is built to the same engineering standard: two independent power paths, redundant cooling, seven layers of physical security and uninterrupted operation even during maintenance.

2NUPS and power distribution
72 hGenerator fuel on site
1,24Average annual PUE
7Layers of physical security
Campus

Anatomy of a Kale campus.

The FRA-1 Frankfurt campus has four data halls, rooftop free-cooling chillers, a 2N+1 generator yard and two separate substations. Our other facilities follow the same reference design.

Isometric view of the FRA-1 campus: data halls, rooftop chillers, generator yard, substations and fiber entrieskaledatacenterFRA-1Free-cooling chillers10 × chillers · N+1Generator yard2N+1 · 72 hours of fuelSubstations A / BTwo separate 154 kV linesFiber entry 1 / 2Diverse routesData halls4 halls · 6 MW IT load
Figure 1 · FRA-1 campusTwo fiber entries reach the building over diverse routes. Substations A and B are fed from separate 154 kV lines.
Data hall

Six systems inside the hall.

Click the numbers to explore the specifications of the power, cooling, security, fire, network and operations systems.

FRA-1 · Hall 3Cutaway · 2,240 m² · 246 racks

Cutaway of Hall 3: electrical room, MMR, precision cooling, hot-aisle contained rack rows, private cage, gas suppression and mantrapELECTRICAL ROOM E-3MMR-1123456
Private cageFiber trayRack
System 01

Power

Every hall is fed from two independent substations. Each of the A and B paths can carry the full load on its own.

UPS architecture2N
Generators2N+1
On-site fuel72 hours
Utility feedTwo separate substations
Per rackUp to 130 kW
System 02

Cooling

Precision cooling units run N+1. Free cooling removes the need for compressors for most of the year.

Precision coolingN+1 CRAH
Free cooling70% of the year
Liquid coolingDLC and RDHx
AislesHot-aisle containment
Annual PUE1.24
System 03

Security

Seven separate checkpoints stand between the gate and the hall. Every pass is matched to an identity and logged.

Physical layers7 layers
AuthenticationBiometric + card + PIN
EntryMantrap portals
CCTV retention90 days
Security staffOn site 24/7
System 04

Fire & hazards

Air-sampling VESDA detectors catch smoke minutes early. Suppression uses a gas that does not harm equipment.

Early warningVESDA
SuppressionNovec 1230 gas
SeismicBase isolators
FloodOutside flood zones
BuildingSingle-story concrete
System 05

Network

Carriers enter the building through the MMR over diverse routes. Cross-connect requests are completed the same day.

Carriers400+
Backbone400G
Fiber entry4 diverse entry points
Cross-connectsSame day
RoutingRPKI-validated BGP
System 06

Operations

Every location has engineers on site. Work in your cage starts within 15 minutes and is fully reported.

NOC24/7 Istanbul
Response15 minutes
EngineersOn site at every location
PortalDCIM and API
MaintenanceConcurrently maintainable
Power

Two independent paths to every rack.

The A and B feeds come from different substations, and each is sized to carry the full load on its own. If the grid fails, generators take over within 10 seconds.

2N power distribution single-line diagram FEED A FEED B GRID A154 kV line 1TR-A2,500 kVAUPS-A2 × 1,250 kVAPDU-AMetered GRID B154 kV line 2TR-B2,500 kVAUPS-B2 × 1,250 kVAPDU-BMetered RACK A + B dual feed GEN-A2N+1 · 72 h fuel GEN-B2N+1 · 72 h fuel ATS · 10 s ATS · 10 s Each path is sized to carry the full load on its own.
Figure 2 · 2N power distributionSingle-line diagram. Dashed lines show generator paths on standby.
Physical security

Seven checkpoints to your rack.

  1. 01Perimeter

    Double fencing, vehicle barriers and thermal cameras along the site boundary.

  2. 02Building entry

    24/7 security staff, appointments and ID checks.

  3. 03Mantrap

    Single-person portals; only one person can pass at a time.

  4. 04Data hall

    Three-factor authentication with biometrics, card and PIN.

  5. 05Cage

    Customer-specific card readers and in-cage cameras.

  6. 06Rack

    Locked rack doors; every opening is logged.

  7. 07Records

    All entries and camera footage are kept for 90 days.

Cross-section of physical security layers 01 PERIMETER 02 BUILDING 03 MANTRAP 04 HALL 05 CAGE 06 RACK 07 RECORDS RACK
Figure 3 · Security layersHover over a layer in the list.
Specifications

The same standard at every facility.

Site-specific values and single-line diagrams are shared with your technical team after a non-disclosure agreement.

Power

UPS architecture2N
Generators2N+1
On-site fuel72 hours
Utility feedTwo separate substations
Per rackUp to 130 kW

Cooling

Precision coolingN+1 CRAH
Free cooling70% of the year
Liquid coolingDLC and RDHx
AislesHot-aisle containment
Annual PUE1.24

Security

Physical layers7 layers
AuthenticationBiometric + card + PIN
EntryMantrap portals
CCTV retention90 days
Security staffOn site 24/7

Fire & hazards

Early warningVESDA
SuppressionNovec 1230 gas
SeismicBase isolators
FloodOutside flood zones
BuildingSingle-story concrete

Network

Carriers400+
Backbone400G
Fiber entry4 diverse entry points
Cross-connectsSame day
RoutingRPKI-validated BGP

Operations

NOC24/7 Istanbul
Response15 minutes
EngineersOn site at every location
PortalDCIM and API
MaintenanceConcurrently maintainable
Certifications

Independently audited every year.

Certificates and audit reports are shared after a non-disclosure agreement.

  • Uptime Tier IVDesign & construction
  • ISO 27001Information security
  • ISO 22301Business continuity
  • ISO 9001Quality management
  • ISO 50001Energy management
  • PCI DSSPayment security
  • SOC 2 Type IIAudit report
  • KVKKData protection