Stockholm data center
Stockholm (Sweden) Tier III facility: colocation, cloud and connectivity services. Netnod and 42 carriers with same-day cross-connects.
- Design standard
- Tier III
- Critical IT capacity
- 12 MW
- Carriers and IXs
- 42+
- Latency to Istanbul
- ≈ 31 ms
STO specifications.
Every facility follows the same reference design. Site-specific single-line diagrams are shared after a non-disclosure agreement.
| Location | Stockholm, Sweden |
|---|---|
| Facility code | STO-1 |
| Design standard | Uptime Tier III |
| Critical IT capacity | 12 MW |
| Power | 2N UPS · 2N+1 generators · 72 hours of fuel |
| Cooling | N+1 precision cooling · hot-aisle containment |
| Security | 7 layers · biometric access · 24/7 security staff |
| Internet exchange | Netnod |
| Coordinates | 59.33, 18.07 |
Stockholm facility services.
Estimated latency from major cities.
Values are estimated round-trip times based on distance.
| Source | Distance | Latency |
|---|---|---|
| Istanbul | 2,173 km | 31 ms |
| Ankara | 2,393 km | 34 ms |
| Frankfurt | 1,187 km | 18 ms |
| London | 1,433 km | 21 ms |
| Dubai | 4,758 km | 66 ms |
| New York | 6,320 km | 87 ms |
For disaster recovery and multi-region setups.
Stockholm data center FAQ.
Which services are available at the Stockholm data center?
All of our products, including colocation, private cages, cloud servers, bare metal, object storage, interconnection and DDoS protection, are available at our Stockholm facility. Ask our sales team for current availability of high-density and liquid-cooled space.
What is the latency from Türkiye to Stockholm?
The estimated round-trip latency between Istanbul and Stockholm is about 31 milliseconds. Actual values vary by carrier and route.
Can we visit the Stockholm facility?
Yes. We run facility tours by appointment, where you can inspect the halls, power and cooling infrastructure and security procedures with our engineers.