10 criteria for choosing a data center
The power, cooling, connectivity, security, contract and operations criteria to evaluate when choosing an enterprise data center or colocation provider.
By: Solution Architecture Team
A data center contract usually runs from three to ten years, and moving is expensive. So when choosing, look beyond the rack price at how the facility will meet your needs in the years ahead.
1. Power architecture
Ask about UPS and generator redundancy (N+1, 2N), whether two independent feeds reach each rack and how many hours of fuel are stored on site.
2. Power density per rack
5 kW may be enough today, but new-generation servers and GPU systems exceed 30 kW per rack. Find out whether the facility can support high density in the future.
3. Cooling and efficiency
Aisle containment, free cooling and the annual average PUE affect both your operating costs and your carbon footprint.
4. Carrier neutrality
Facilities tied to a single carrier weaken your negotiating position. Check how many carriers are in the building and how long cross-connects take.
5. Physical security
Ask how many layers of access control there are, how long camera footage is kept and whether security staff are on site 24/7.
6. Independent certifications
Request current copies of ISO 27001, ISO 22301, PCI DSS and SOC 2 reports along with Tier certificates.
7. Location and natural hazards
Risks such as earthquakes, flooding and proximity to industrial sites should be weighed together with how easily your team can reach the facility.
8. On-site operations
Response time, scope and pricing of Remote Hands should be clearly written into the contract.
9. Growth capacity
A right of first refusal on additional space in the same hall or campus keeps you from having to split your systems later.
10. Contract and SLA
The contract should define measurable SLA values for power, temperature, humidity and response time, along with service credits if they are breached.